Heathrow Oyster CPC Gatelines

Project Brief

Develop architectural intent into fabrication designs for manufacture. Manufacture & install Ticket Enclosures & Wall Linings for the CPC Gatelines project at Heathrow Airport. Structural design and calculations to be undertaken and installation to be approved by Building Control. Ensure compliance with ASIAD and fire ratings.

Project Particulars
Airport: Heathrow Airport
Contractor: MACE Aviation
Scope of Supply: Structural & fabrication design, manufacture & installation
Design & Engineering: Baker Bellfield
Manufacture: Baker Bellfield
Installation: Baker Bellfield