Develop Cab Partition Wall designs for new Inspiro trains for London Underground.
Perform Static Load Testing in accordance with GM/RT 2100 Issue 5, Fire Testing to EN45545-2 and BS6853, Acoustic Testing to BS EN ISO 10140-2, and Shock & Vibration Testing to BS EN 61373-3:2010.
Undertake First Article Inspections, and ensure delivery and quality standards are maintained during series production.
| Customer: | Siemens Mobility |
| TOC : | London Underground |
| Scope of Supply: | Cab Partition Walls |
| Concept Design: | PriestmanGoode |
| Design Engineering: | Baker Bellfield |
| Manufacturing : | Baker Bellfield |